HaloKlear™ is protecting the environment by addressing the impact of storm water, construction site run-off, and wastewater and meeting other water recycling needs.

Read our latest case study - The Balsa Inferior Hydroelectric Project

 

HaloKlear LiquiFloc™

This solution is unmatched in the removal of sediment and turbidity when used in conjunction with gravitational settling, biofiltration and conventional filtration systems.

HaloKlear GelFloc™

This versatile system addresses a wide variety of pollutant types including total suspended solids, algae, hydrocarbons, heavy metals, oils and organic compounds

HaloKlear
DBP-2100™ & LBP-2101™

These patent-pending bioploymer products produce superior floc size and unmatched stability as part of our Dual Polymer System (DPS).

HaloKlear
DPS Jar Test Kit™

This testing tool is used to determine the proper dose rate needed for HaloKlear products.

Request A FREE Kit

Dose Calculator

HaloKlear Biopolymer Residual Test Kit™

This kit uses proven test methods for detecting the presence of residual biopolymer before it leaves the job site

Airport Runway in Alaska requires innovative stormwater treatment

Petersburg Alaska is a fishing village in southeast Alaska. The Petersburg James A. Johnson Airport needed to upgrade its Runway Safety Area from the existing 200 feet to the FAA compliant 1000 feet. Additionally, the Runway Safety Area would be widened to 500 ft along its entire length. A total of five new cross-runway culverts would be installed and drainages redirected to pass through the newly installed culverts.

MORE>

Maryland Intercounty Connector

The Maryland Intercounty Connector project has finally become a reality. Approved in May 2006, the project began in the fall of 2007 and is expected to be completed in 2012. Since the project’s beginnings nearly fifty years ago, environmental groups and local home owners have been concerned about the environmental impact of the project. Approval was given only after Maryland agreed upon mitigations to meet environmental, economic, and community requirements.

MORE>

HaloKlear Youtube Channel >

HaloKlear Flickr Gallery >

Coming Soon!

Organic Material Used to
Treat Turbidity

A Vancouver company provided an international tunneling contractor with a sediment control solution during a major water utility project.

MORE>

Tackling Sediment and
Runoff Control

Preparation can be the contractor’s key to success. Taking steps to prepare for problems that can happen—before they do—means finding solutions for your project’s erosion problems once, not
several times.

MORE>

Keep Up-To-Date with HaloKlear. Read our blog.

StormCon 2010 Attendees Positive about Stormwater Industry Outlook